Punggol 4 Room HDB Renovation: Part 6 – Day 25 – Carpentry Works

A normal full renovation like this 4 room HDB takes about 6 weeks to complete.  As we approach the end of week 4, all the major works are about to be completed.

Living Room

Punggol 4 Room HDB Day 25 (Carpentry Works)-Living Room- Main door

Punggol 4 Room HDB Day 25 (Carpentry Works) – Living Room – Divider

Punggol 4 Room HDB Day 25 (Carpentry Works) – Living Room – Divider

Punggol 4 Room HDB Day 25 (Carpentry Works) – Living Room – TV console

  • The front door and gate were repainted.
  • Carpentry works: A divider with shelvings and a TV console were installed.
  • Sanitary and kitchen accessories were delivered and placed in the living room.

Kitchen

Punggol 4 Room HDB Day 25 (Carpentry Works) – Kitchen

Punggol 4 Room HDB Day 25 (Carpentry Works) – Kitchen

  • The kitchen cabinet is still in “work in progress” stage.
  • The hood and hob were installed.
  • The “unsightly” pipe will be concealed by the carpentry works.

Common Toilet

Punggol 4 Room HDB Day 25 (Carpentry Works) – Common Toilet

  • After some cleaning up, the beautiful tiling works can be seen clearly.

Common Room 1

Punggol 4 Room HDB Day 25 (Carpentry Works) – Common Room 1

Punggol 4 Room HDB Day 25 (Carpentry Works) – Common Room 1

Punggol 4 Room HDB Day 25 (Carpentry Works) – Common Room 1

Punggol 4 Room HDB Day 25 (Carpentry Works) – Common Room 1

  • The white background with pink strips creates a lovely ambience for the princess room.
  • Vinyl flooring was installed.
  • 3 inch timber skirting is used for the whole house.

Common Room 2

Punggol 4 Room HDB Day 25 (Carpentry Works) – Common Room 2

Punggol 4 Room HDB Day 25 (Carpentry Works) Common Room 2

Punggol 4 Room HDB Day 25 (Carpentry Works) – Common Room 3 – Door frame repainted.

  • Painting and flooring works were completed.
  • The old door frames were repainted.

Master Room

Punggol 4 Room HDB Day 25 (Carpentry Works) – Master Bedroom

Punggol 4 Room HDB Day 25 (Carpentry Works) – Master Bedroom – Wardrobe

Punggol 4 Room HDB Day 25 (Carpentry Works) – Master Bedroom – Wardrobe

Punggol 4 Room HDB Day 25 (Carpentry Works) – Master Bedroom – Wardrobe internal

Punggol 4 Room HDB Day 25 (Carpentry Works) – Master Bedroom – Blum hinge system

Punggol 4 Room HDB Day 25 (Carpentry Works) – Master Bedroom – Blum hinge system

  • The carpenter is doing the final touch up of the custom made wardrobe.
  • Blum hinge system is used to ensure the doors are closed silently and effortlessly.  Blum is the leading brand that provides accessories for furnitures and cabinets makers.

Master Toilet

Punggol 4 Room HDB Day 25 (Carpentry Works) – Master Toilet – Vanity Punggol 4 Room HDB Day 25 (Carpentry Works) – Master Toilet – Vanity

Punggol 4 Room HDB Day 25 (Carpentry Works) – Master Toilet – Shower area

Information about the Interior Designer:

Interior Designer Ben Ng

Name: Ben Ng

Experiences: working as a Interior Designer since 2006

Mobile: 9746 2581

Company: BEHome Design Concept

Website: http://www.behomedc.com/index.htm

Also see here for another of his master piece.

Do mentioned that you viewed his works on Vincent Interior Blog for attractive discounts or free gifts!


Blog about Interior Design, renovation and home improvement.

Advertisement

No comments.

Leave a Reply

%d bloggers like this: